BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P1H
REFRESH-INTERVAL:P1H
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
RRULE:FREQ=YEARLY;BYMONTH=3;BYDAY=2SU
DTSTART:20070101T000000
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:Central Daylight Time
END:DAYLIGHT
BEGIN:STANDARD
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
DTSTART:20070101T000000
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:Central Standard Time
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20270421T090000
DTEND;TZID=America/Chicago:20270421T140000
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Project Scheduling Workshop
DESCRIPTION:Build Better Schedules.  Run Better Projects.A Hands-On Construction Scheduling Workshop for Teams\nA great construction schedule is more than a project requirement   it's one of the most valuable tools for planning work\, coordinating trades\, anticipating challenges\, and keeping projects on track.In this interactive\, hands-on workshop\, participants will strengthen their understanding of Critical Path Method (CPM) scheduling and gain practical experience using scheduling software. Through guided exercises and real-world construction scenarios\, attendees will learn how to build\, evaluate\, update\, and manage schedules that support better decisions in the field and the office.Participants will learn how to:Understand the "why" behind scheduling   discover how effective scheduling improves planning\, communication\, risk management\, and overall project performance.Apply scheduling fundamentals   work with activities\, durations\, relationships\, critical path\, and float to understand how schedules are built and how changes affect project completion.Get hands-on experience with CPM software   complete practical exercises creating\, modifying\, evaluating\, and updating construction schedules.Build and evaluate better schedules   identify missing activities\, unrealistic durations\, sequencing problems\, and other common scheduling issues.Keep schedules accurate and useful   understand the importance of baselines\, regular progress updates\, and keeping the schedule aligned with actual jobsite conditions.Identify and manage delays proactively   evaluate the impact of delays\, explore recovery options\, and make adjustments before small problems become major setbacks.Connect the schedule to day-to-day project management   use the master schedule to support look-ahead planning\, trade coordination\, project meetings\, and accountability.What to ExpectThis is an interactive workshop\, not a lecture. Participants will complete multiple hands-on scheduling exercises using CPM software\, applying concepts to realistic construction scenarios throughout the class.Important Participant InformationLaptop and software required: Each attendee must bring their own laptop with CPM scheduling software installed and ready to use.Demonstrations will be done in Microsoft Project\, but other applications are welcome including\, but not limited to: P6\, OPC\, PhoenixCPM\, OutbuildLunch is provided.Instructor:Kendall Pouland | President
X-ALT-DESC;FMTTYPE=text/html:<!DOCTYPE html><html><head><title></title></head><body aria-disabled="false"><p><a fr-original-style="" href="https://www.buildbetterways.com/" rel="noopener noreferrer" style="user-select: auto\;" target="_blank"><img src="https://res.cloudinary.com/micronetonline/image/upload/v1795038060/tenants/8ecfbe47-8d35-4b34-bc78-813cea65d01a/c612f23483924ddfbdfc0e2fc8ceadd8/Project-Scheduling-Workshop-Event-Graphic.png" width="791" height="445" fr-original-style="" fr-original-class="fr-draggable" style="position: relative\; max-width: 100%\; cursor: pointer\; padding: 0px 1px\;" /></a></p><p style="text-align: center\;"><strong fr-original-style="" style="font-weight: 700\;"><span style="font-size: 24px\; color: rgb(184\, 49\, 47)\;">Build Better Schedules. &nbsp\;Run Better Projects.</span></strong></p><p style="text-align: center\;"><strong fr-original-style="" style="font-weight: 700\;"><span style="font-size: 18px\; color: rgb(184\, 49\, 47)\;">A Hands-On Construction Scheduling Workshop for Teams</span></strong></p><p><img src="https://res.cloudinary.com/micronetonline/image/upload/q_auto\,f_auto\,c_limit\,w_1536\,h_1024/v1795121965/tenants/8ecfbe47-8d35-4b34-bc78-813cea65d01a/50609bbb62974e15a47fd228eb207177/In-Person-Class.png" width="116" style="width: 116px\; height: 77.7447px\; position: relative\; max-width: 100%\; cursor: pointer\; padding: 0px 1px\;" height="77.7447" fr-original-style="width: 116px\; height: 77.7447px\;" fr-original-class="fr-draggable" /><br /></p><p><span style="color: rgb(0\, 0\, 0)\;">A great construction schedule is more than a project requirement &mdash\; it&#39\;s one of the most valuable tools for planning work\, coordinating trades\, anticipating challenges\, and keeping projects on track.</span></p><p><span style="color: rgb(0\, 0\, 0)\;">In this interactive\, hands-on workshop\, participants will strengthen their understanding of Critical Path Method (CPM) scheduling and gain practical experience using scheduling software. Through guided exercises and real-world construction scenarios\, attendees will learn how to build\, evaluate\, update\, and manage schedules that support better decisions in the field and the office.</span></p><p><span style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Participants will learn how to:</strong></span></p><ul fr-original-style="margin-top:0in\;" style="margin-top: 0in\; list-style-position: inside\;" type="disc"><li style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Understand the &quot\;why&quot\; behind scheduling</strong> &ndash\; discover how effective scheduling improves planning\, communication\, risk management\, and overall project performance.</li><li style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Apply scheduling fundamentals</strong> &ndash\; work with activities\, durations\, relationships\, critical path\, and float to understand how schedules are built and how changes affect project completion.</li><li style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Get hands-on experience with CPM software</strong> &ndash\; complete practical exercises creating\, modifying\, evaluating\, and updating construction schedules.</li><li style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Build and evaluate better schedules</strong> &ndash\; identify missing activities\, unrealistic durations\, sequencing problems\, and other common scheduling issues.</li><li style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Keep schedules accurate and useful</strong> &ndash\; understand the importance of baselines\, regular progress updates\, and keeping the schedule aligned with actual jobsite conditions.</li><li style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Identify and manage delays proactively</strong> &ndash\; evaluate the impact of delays\, explore recovery options\, and make adjustments before small problems become major setbacks.</li><li style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Connect the schedule to day-to-day project management</strong> &ndash\; use the master schedule to support look-ahead planning\, trade coordination\, project meetings\, and accountability.</li></ul><p><span style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">What to Expect</strong></span></p><p><span style="color: rgb(0\, 0\, 0)\;">This is an interactive workshop\, not a lecture. Participants will complete multiple hands-on scheduling exercises using CPM software\, applying concepts to realistic construction scenarios throughout the class.</span></p><p><span style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Important Participant Information</strong></span></p><ul fr-original-style="margin-top:0in\;" style="margin-top: 0in\; list-style-position: inside\;" type="disc"><li style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Laptop and software required:</strong> Each attendee must bring their own laptop with CPM scheduling software installed and ready to use.</li><li style="color: rgb(0\, 0\, 0)\;">Demonstrations will be done in Microsoft Project\, but other applications are welcome including\, but not limited to: P6\, OPC\, PhoenixCPM\, Outbuild</li><li style="color: rgb(0\, 0\, 0)\;">Lunch is provided.</li></ul><p><span style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Instructor:</strong></span></p><p><span style="color: rgb(0\, 0\, 0)\;"><strong fr-original-style="" style="font-weight: 700\;">Kendall Pouland</strong> | President &nbsp\;</span></p><p><a fr-original-style="" href="https://www.buildbetterways.com/" rel="noopener noreferrer" style="user-select: auto\;" target="_blank"><img src="https://res.cloudinary.com/micronetonline/image/upload/c_limit\,w_1050\,h_600/v1769101305/tenants/8ecfbe47-8d35-4b34-bc78-813cea65d01a/9688cb193b0246ac8b63b7d534ea714e/Build-Better-Ways-Transparent-Logo-Rectangle-Stacked.png" width="165" style="width: 165px\; height: 94.2857px\; position: relative\; max-width: 100%\; cursor: pointer\; padding: 0px 1px\;" height="94.2857" fr-original-style="width: 165px\; height: 94.2857px\;" fr-original-class="fr-draggable" /></a><br /></p></body></html>
LOCATION:3825 Dacoma St. Houston TX 77092
UID:e.2835.1698247
SEQUENCE:3
DTSTAMP:20261120T135227Z
URL:https://members.agchouston.org/calendar/Details/project-scheduling-workshop-2003358?sourceTypeId=Hub
END:VEVENT
END:VCALENDAR
